Piedmont Project Completion Draws Praise The Department started contacting local businesses and residents months prior to the project startup. With an effective outreach campaign, our DWM staff established a close working relationship with the people who would be affected by the month-long project. The project, which involved the replacement of about 1,000 feet of sewer pipe and the extension of the sewer some 125 feet toward Peachtree Road, was necessary to provide the sewer capacity to support growth in the area. Those affected understood intuitively that such a project would benefit them in the long run, but they worried that the resulting traffic tie-ups would cause people to avoid the area altogether. Crews worked around the clock to complete the project a week ahead of time. Meanwhile, Project Manager Tom Jones kept the community updated with regular emails describing the daily progress. “We knew this project had the potential to disrupt peoples’ day-to-day lives,” said Commissioner Rob Hunter. “We were determined that we would make sure that disruption was as small as we could possible make it. Based on the complimentary emails we’ve gotten from the community since we finished the project, I’d say we succeeded. Our sincere gratitude goes out to all those who showed tremendous patience during this time.” The Piedmont Road Sewer Capacity Improvement Project is part of the $3.9 billion Clean Water Atlanta Program to overhaul the City’s water and wastewater infrastructure and ensure clean, safe drinking water for Atlantans and our downstream neighbors..
|
||||||
CSO Projects on Track For On-Time Completion When November 2007 rolls around, the City will have completed 57 of 58 Consent Decree Milestones and 10 of the 11 required CSO remediation projects. With the exception of the West CSO Tunnel project, and the need for more concrete tunnel lining than anticipated, every CSO project in the City’s long-term remediation plan will have been completed. |
||||||
Co-op Program Gives Students Experience College students who have earned at least 60 credit hours in a degree program and are currently enrolled in school get valuable experience helping the City track, identify and map its “buried assets,” infrastructure like pipes and mains that lie beneath the ground. In working with the students, DWM is able to extend its workforce by employing smart young people who can work up to 40 hours per week while attending school. Taxpayers benefit because these students perform necessary tasks at one-third the price of contractors. DWM’s co-op program works with Georgia Tech, Clark-Atlanta University, Morehouse and DeVry. Interested students can apply through the City’s Buried Asset Management Institute at 404-589-2696. Once accepted into the program, students can work as long as they are still enrolled in school. |
||||||
Old Techniques Help Stabilize Streams The new/old techniques offer a “soft” approach to streambank protection and stabilization. So-called “harder” techniques include the application of rocks and gabions (steel-mesh baskets filled with rocks) to build up and stabilize streambanks. The preferred approach incorporates both hard and soft techniques. “You put rock along the toe (edge where the water meets the bank) to armor the bank, then you pound these willow stakes in [among the rocks] along streambanks, and they root,” Brigham explains. “It’s erosion control through root zone development.” Along with the placement of live stakes, crews also apply a wattle made from green coconut husks. “Water flows through it, but sediment doesn’t,” Brigham says. “Unlike with silt fencing, which is made of plastic, you don’t have to pull it out later. When you pull silt fencing down, you are left with exposed soil.” Last month, DWM’s Greenway Division finished its first streambank revitalization on a 1,000-foot stretch of streambank at Wilson Mill Park. The City’s creek crossing crews rebuilt the streambank using large rock and gabions earlier in 2006, and greenway crews followed afterward, planting live stakes and adding wattle and a straw/grass seed mix. Such practices, says Brigham, “add more ‘bio’ to the ‘bio-engineering process of stream stabilization.” When the live stakes and grass seeds sprout this spring, the streambank will begin to develop a vegetated buffer (mix of grasses, flowering plants, shrubs and trees) that will help prevent erosion and protect the quality of the water, both in the City and downstream. Under the Greenway Acquisition Program, the City has spent $18.5 million to purchase interests in 1,181 acres to be protected in perpetuity. Undeveloped streambanks help filter pollutants and protect creeks and rivers from the stresses of urban life. Part of the Consent Decree that governs Combined Sewer Overflows, the Greenway Acquisition Program will be completed this month. |
||||||
Hot Wash Participants Learn From Experience On November 17, 2006, the drinking water treatment plant that serves West Point’s 5,000 water customers was shut down because “an unknown granular substance [was found] in the troughs between the sedimentation basins and the filters.” West Point shut down the plant to investigate, called the local police department and the state Environmental Protection Division (EPD), and requested emergency water supplies from nearby Lanett, Ala. At the January 24 Hot Wash, DWM representatives and people from other local and state agencies analyzed West Point’s emergency response from beginning to end. According to Angus Reed, DWM Emergency Response Planner, a city the size of Atlanta can still learn quite a bit from West Point’s responses. “Every time something like this happens, it gives us an opportunity to review our own plans,” he says. In the case of West Point, the water plant was offline from November 17 to November 22, when chemical laboratory tests of the granular substance showed nothing toxic or harmful in the samples. Atlanta, says Reed, would do things differently. “It’s contrasting a small, unsophisticated system with a large, sophisticated one,” he says. Another application, according to Reed, involves Atlanta’s own water testing procedures. “We’re looking at our sampling procedures and equipment to make sure they are adequate” for an emergency situation, he says. Participating in a Hot Wash also encourages people to ask questions such as, “How do we get a special piece of equipment quickly?” or “Which sub-units in the department can be brought in for specific purposes?” during an emergency, Dulaney says. |
||||||
Virginia-Highland Rehab Nearly Complete As of mid-December, work crews had evaluated 150,000 linear feet of Virginia-Highland sewer line and rehabbed 94,000 linear feet, with 15,000 linear feet to go. “We’ve evaluated roughly 28 miles of sewer, and we’ve repaired 18 of those miles,” notes Public Information Manager Diane Badger, who has worked closely with the community during the project. “So, we’ve repaired almost two-thirds of the sewer lines in Virginia-Highland.” Along the way, the contractor, Insituform/EPR, demonstrated the robotic CCTV equipment for students of Morningside Elementary School at the school’s annual career day event. The kids had lots of fun manipulating the robotic camera and viewing themselves on the TV monitor inside the truck.By the time it is complete, the project is expected to cost around $10 million. Part of the 1999 Consent Decree negotiated to eliminate water quality violations from sanitary sewer overflows (SSOs), the sewer rehab work includes evaluations, rehabilitation and replacement of defective sewer lines, as well as the upsizing of lines deemed too small to accommodate current use. After completion of the Virginia-Highland project, crews will move on to Midtown, where sewer lines are currently being evaluated. The Midtown-Georgia Tech Water Main Replacement Project is slated to begin during the second quarter of this year. The affected area is roughly defined by 14th and Pine streets on the north and south, and Monroe and Northside drives on the east and west. |
||||||
The Nancy Creek Tunnel has won the “Honor Award for Engineering Excellence” presented by the Georgia Engineering Alliance. The award was presented to the City’s Project Manager Ade Abon and project engineer Mike Robison of Jordan, Jones & Goulding at an awards ceremony wrapping up the “2007 Georgia Engineers Week.” Previously, the tunnel had won the Georgia Chapter of the American Society of Civil Engineers’ award for Large Project of the Year. |
||||||
DWM Spearheads New Resident Kit Development Representatives from all City departments, the Atlanta Development Authority, Atlanta Convention and Visitors’ Bureau and Brand Atlanta collaborated over nine months to create the informational booklet and contributed giveaway items. The Department of Watershed Management developed the materials and produced the booklet. The recently annexed neighborhoods in Southwest Atlanta received hand-delivered New Residents’ Kits to welcome them into the City. |
||||||
Israelis Study DWM Sewer Inspection Methods City staff used the Peachtree trunk siphon at Woodward Way for the demonstration. Alan McCloskey with Amtec Surveying, a sub-contractor on the SSES and Large Diameter Pipe Cleaning and Assessment contracts, and Tom Jones with the Program Management Team, coordinated and conducted the demonstration. The City uses sonar to inspect full-flowing sewers. |
||||||
The Atlanta-Fulton County Water Treatment Plant has become Georgia’s first publicly owned, privately operated water or wastewater treatment facility to win a Gold Star Award from the Occupational Health and Safety Administration for excellence in occupational safety and health. The plant is participating in OSHA’s Voluntary Protection Programs, which commits it to employee protection beyond the requirements of OSHA standards. The plant is operated by joint venture partner Veolia Water/Khafra. “Our employees are our most important resource,” noted Commissioner Rob Hunter. “That’s why this award makes us especially proud. It recognizes our ongoing commitment to our workforce.” |
||||||
DWM Employee Gets in NBA Hall of Fame – as a Speaker |
||||||
Click here to sign-up and receive News In A Splash directly to your email box. |
||||||
To learn more about the Department of Watershed Management, please visit www.Atlantawatershed.org and www.CleanwaterAtlanta.org |
||||||
55 Trinity Avenue, Suite 5400 |
||||||