The Greensferry CSO Facility is located at 175 Stafford Street in a residential area. Constructed in 1994, the Greensferry CSO Facility is a West Area CSO facility, serving a combined sewershed of approximately 746.0 acres, with a maximum overflow capacity of 1,340 million gallons per day (mgd). Dry weather flow is routed to a 24-inch Proctor Creek trunk which then pumps flow to the R.M. Clayton WRC or the Utoy Creek WRC. Wet weather flow that exceeds the capacity of the interceptor is diverted to the CSO facility for treatment prior to discharge to Proctor Creek. Existing treatment consists of coarse screening, fine screening, and disinfection by sodium hypochlorite. The sodium hypochlorite injection occurs upstream of the Greensferry CSO Facility to provide for proper disinfection and for minimized chlorine residual prior to discharge to a tributary of Proctor Creek. The injection point also assures that all CSO, both screened and unscreened (bypassed), is disinfected.

CSO events for the past 30 days (ordered by most recent activity):
Start TimeEnd TimeDuration (minutes)