Traffic Advisory: New Detour Routes for Road Closure on Bolton Road NW Due to Sewer Work
Phone: 404-546-3200
TRAFFIC ADVISORY
New Detour Routes for Road Closure on Bolton Road NW Due to Sewer Work
What: Road closure due to replacement of force main.
Where: Bolton Road NW will be closed to through traffic between Northwest Drive NW and Parrot Avenue NW.
When: Monday, June 25, 2018 – Thursday, June 28, 2018 (Work hours 9 a.m. – 4 p.m.)
Comments: Crews will replace a 36-inch force main from the Bolton Road Pump Station resulting in closure of the road.
Construction began on Monday, June 25, 2018 and will last approximately four days. The road will be closed during the work hours of 9 a.m. – 4 p.m. Traffic control measures and signs are in place to guide motorists around the work zone. Residents and businesses will continue to have access to mail and package delivery, emergency services and trash pick-up. Motorists are urged to use caution and to avoid the area if possible.
UPDATED DETOUR ROUTE: Traveling southbound on Bolton Road NW, turn left onto James Jackson Parkway and travel south to Donald Lee Hollowell Parkway, make a right onto Donald Lee Hollowell Parkway then a left on Bolton Road to continue south.
Traveling northbound on Bolton Road NW, turn right onto Donald Lee Hollowell Parkway and travel south to James Jackson Parkway. Make a left onto James Jackson and travel northeast back to Bolton Road, turn right onto Bolton Road to continue north.
If traveling on I-285 north, the Bolton Road exit will be closed to traffic. Signage directs motorists to exit at South Cobb Drive, turn right at exit and travel 0.8 miles south to Bolton Road. Make a left at Bolton to continue northbound travel.
###
www.atlantawatershed.org