(404)-546-0311
/
Contact Us
Atlantawatershed.org | Atlantawatershed.org | Atlantawatershed.org |
  • I Want To…
    • Start My Service
    • End My Service
    • Report A Problem
    • Address an Illegal Consumption Notice
    • Make an Open Records Request
    • Apply For A Toilet Rebate
    • Get A Senior Citizen Discount
    • Give DWM Feedback
    • Register As A Vendor
    • Prepare for Emergencies
    • Apply For A Job
    • Contact DWM
  • Inside DWM
    • Executive Bio for Commissioner Greg Eyerly
    • Strategic Priorities
    • DWM Strategic Plan 2022
    • DWM Annual Report 2022
    • DWM Annual Report 2019
    • Offices
      • Office of the Commissioner
        • Office of Communications and Community Relations
          • Community Outreach
        • Office of Safety and Security
        • Office of Information Technology
        • Policy and Intergovernmental Affairs
      • Office of Linear Infrastructure Operations
        • Technical Services
      • Office of Water Treatment and Reclamation
      • Office of Engineering Services
        • Backflow Compliance
      • Office of Financial Administration
      • Office of Watershed Protection
        • Green Infrastructure
        • Greenway Acquisition Project
        • Stormwater Ordinance
        • Stormwater Management
        • Grease Management
        • Environmental and Construction Enforcement
        • Environmental Impact Bond
        • Floodplain Management
        • Watershed Improvement Plans
      • Office of Customer Care and Billing Services
    • COA Standard Details
    • Document Repository
    • Water Quality Reports
    • History
    • Vendor Development
    • Video Carousel
  • Newsroom
    • Media Advisories
    • Press Releases
    • Traffic Advisories
    • Traffic Map
    • Newsletters
    • Disclaimer
    • Privacy
  • Projects
    • Capital Improvement Program
    • Clean Water Atlanta Program
    • Water Supply Program
  • Customer Service
    • DWM Customer Payment Portal
    • New Customer Welcome
    • Customer Service Experience Portal
    • Pay My Bill
    • Bill Calculator
    • Water & Sewer Rates
    • Late Fee
      • COA Standard Details
    • Request An Account Adjustment
    • Industrial Surcharge Fee Increase
    • Requests for Balance Pay-Off
    • Obtain Meter Installation or Rental Services
    • Forms
    • Care and Conserve
    • Care and Conserve Plumbing Repair Program
Home Environmental and Construction Enforcement

Environmental and Construction Enforcement

Office of Watershed Protection
Soil Erosion and Sedimentation Control

Migrating soil from land disturbance sites (construction or private renovations) often creates soil erosion. Erosion is defined as the process by which the land surface is worn away by the action of water, wind, ice and gravity. When soil is disturbed (exposed or uncovered), it becomes vulnerable to being washed into local streams and waterways when it rains. Soil is considered a water pollutant because it can significantly affect water used for public consumption, recreation and habitat. Therefore, the most effective way to control soil erosion is at its source. Erosion control best management practices (BMPs) are required on all land disturbance sites to provide a defense against soil erosion. BMPs can be either structural or vegetative. Silt fences, hay bales and various types of plants, including grasses which when designed, installed and properly maintained help in the prevention of water quality damage, are some examples of typical BMPs.

The City of Atlanta’s Environmental and Construction Enforcement Division protects watersheds by enforcing compliance with State laws and City codes related to erosion and sedimentation control.

1. Planning: Develop an erosion control plan by a certified design professional that addresses erosion and sedimentation control during all phases of land disturbance activities to fit the existing site features, including topography, soils, drainage ways, and natural vegetation.
2. Permitting: Submit proper documents to the City to obtain applicable permits.
3. Scheduling of Operations: Schedule a required Pre­Construction Meeting. During this meeting all phases of the project will be discussed. Install initial soil erosion prevention and control practices as a first line of defense against off­site damage prior to initial land disturbance activities.
4. On­going Sediment Control: Apply internal sediment control practices as a second line of defense against off­site damage as illustrated on permitted plan.
5. Maintenance: Implement a thorough maintenance program before, during, and after development is completed.

Document for download:
1. As Built Survey Requirements
2. Commercial Final Sign Off Criteria
3. Commercial Final Sign Off Form
4. Engineer’s Certification
5. Engineer’s Certificate Green Infrastructure (For Commercial Project Use Only)
6. Final Plat Packet
7. Immediate Stop Work Orders
8. Revegetation Requirement
9. SFR Final Sign Off Criteria
10. SFR Final Sign Off Form
11. PreCON form
12. Sanitary Sewer Access Form

For inspection request or to report an erosion concern please call 404­-546­-1305.
Protecting our natural resources, particularly our water, is every citizen’s responsibility. If you see a land disturbance site that is allowing soil to migrate from its boundaries or any other erosion concern, the City of Atlanta welcomes your reporting of that condition. If you choose, your report can be entered as anonymous because your involvement is critical to the protection of our environment.

The City of Atlanta has two enforcement actions which are Notice to Comply and Stop Work Order. A Notice of Comply is implemented when non­ compliance is observed on a land disturbance site but soil is maintained within the site boundaries. A Stop Work is implemented when non­compliance allows sediment to migrate off­site. An illustration of a Stop Work Order placard is below. In some instances court arrest citations are issued along with a Stop Work Order, and arrest citations are issued if compliance is not gained under a Stop Work Order.

Grease Management
Green Infrastructure
Site Development
Environmental and Construction Enforcement

Our Address

Department of Watershed Management Administrative Offices
72 Marietta Street NE
Mon-Fri – 8:15 am to 5:00 pm

City Directory

Need to contact another city department?

What can we help you find?

At a Glance

  • Document Repository
  • Fiscal Years 2023-24 Capital Improvement Projects List
  • Floodplain Management
  • Small Business Development Program 2023

Important News

  • Water Service Interruptions Map
  • Letters To Residents
  • Project Fact Sheets

Boards and Panels

  • Atlanta Fulton County Water Resources Commission (AFCWRC)
  • Riparian Buffer Technical Panel
  • Water and Sewer Appeals Board

Sign Up Newsletter

Make sure you do not miss interesting happenings
by joining our newsletter program.

Sign Up Now

 

View Our Job Openings

City of Atlanta Jobs
Work Source Georgia

 

Services for Accessibility

Georgia Relay – Dial 711

 

Contact Customer Service

ATL 311 – Dial 311 or 404-546-0311

Our center is open Monday through Friday, 7 a.m. to 7 p.m.
Online access is available 24/7/365 at www.atl311.com

19

May
News Release: Greg Eyerly Confirmed as New Commissioner of Department of Watershed Management
...
Read More

16

May
News Release: DWM Continues Work on Road Collapse on Shirley C. Franklin Blvd.
...
Read More
City of Atlanta, Watershed Management © 2025 All Rights Reserved. Phone: 404-546-0311
  • I Want To…
  • /
  • Inside DWM
  • /
  • Newsroom
  • /
  • Projects
  • /
  • Customer Service
  • /